COERR — Centre of Excellence in Resource Recovery for Circular Economy
Infrastructure & Facilities

Shared industrial infrastructure, built for recovery.

Every facility at the Tumakuru Recovery Park is accessible through the digital platform — book a lab slot, apply for a plot, or monitor live operations from the digital twin.

Material Recovery Facility (MRF)

12.4 t/hr throughput · AI optical sorting · 2 processing lines

Automated sorting of mixed dry waste into 14 recoverable fractions with near-infrared and AI-vision separation, feeding downstream recycling units across the park.

Central Laboratories (6 labs)

NABL accredited · XRD, SEM-EDS, ICP-MS, battery cyclers · ₹1,800–4,000/hr

Material characterisation, battery testing, polymer processing, water quality, bioprocess pilot and mechanical testing labs — bookable by the slot through the platform.

Incubation Centre

8 pods · 48 seats · prototyping bay · mentor network

Two innovation blocks hosting circular-economy startups with shared prototyping equipment, structured TRL acceleration and access to consortium investors.

Recovery Park Land Bank

120 acres · 24 serviced plots · 4 zones · ₹450–675/m²

Plug-and-play industrial plots across Processing, R&D, Logistics and Utility zones with common effluent treatment, renewable power and weighbridge infrastructure.

Digital Twin Command Centre

10 live telemetry streams · AI anomaly alerts · 5-second refresh

A real-time virtual replica of park operations — MRF lines, battery refinery, biogas plant, water recovery — with AI-generated operational alerts and briefings.

Logistics & Collection Network

3 e-waste hubs · 40 km collection radius · GPS-tracked fleet

Reverse-logistics infrastructure connecting urban local bodies and industrial generators to the park, with full chain-of-custody traceability.